Kenya Power erects pylons at Suswa SGR electricity line

Kenya Power has erected permanent pylons for the Suswa to Nairobi North double circuit line, raising hope of improved transmission of electricity from one of the major hubs.

Joseph Siror, Kenya Power CEO, disclosed that the permanent pylons were set up on Monday, replacing the temporary overhead lines that had been erected across the standard gauge railway (SGR) line near Gicheru Mines, Kikuyu sub-county, since 2019.

Leave a Reply

Your email address will not be published. Required fields are marked *