Azerbaijan achieves historic milestone with first int’l carbon credits for hydropower

As reported by AzerNEWS, the project was registered on May 28, 2025, by Gold Standard, one of the world’s leading carbon certification bodies, and the carbon credits for the Hydro-3 project were officially issued on January 28, 2026.

These carbon credits represent the first internationally recognized credits for renewable energy in Azerbaijan. Covering the period from April 2024 to August 2025, the project generated a total of 10,745 carbon units, demonstrating a measurable and verifiable contribution to greenhouse gas reduction.

This achievement underscores the successful implementation of Azerbaijan’s green energy strategy and highlights the internationally recognized renewable energy potential of the Garabagh region.

What is a carbon credit, and why does it matter for Azerbaijan?

A carbon credit represents the reduction, avoidance, or removal of one ton of CO2 from the atmosphere and can be traded internationally. They are generated by projects such as renewable energy production, energy efficiency improvements, or reforestation, and are verified by international standards like Gold Standard.

Carbon credits allow companies or countries to offset their emissions while creating financial incentives for green projects. For Azerbaijan, carbon credits are particularly important because they promote renewable energy development, generate international revenue, support the energy transition, and highlight the country’s commitment to climate action.

Projects like Hidro-3 in Lachin show how small hydropower plants can reduce emissions, earn credits, and demonstrate the untapped renewable energy potential of regions like Garabagh, making green energy investments both environmentally and economically valuable.

Why Brussels is scrutinising every cubic metre of Azerbaijani gas?

Europe’s attempt to rid itself of Russian gas has entered a more forensic phase. Having spent the past three years scrambling for alternative supplies, the European Commission is now turning its attention to what it buys, how it is labelled, and whether molecules arriving at the EU’s borders are really what exporters claim them to be. The latest target of this scrutiny is not Moscow directly, but the infrastructure through which gas reaches Europe from Trkiye, including volumes supplied by Azerbaijan.

The European Union has legally adopted a step-by-step prohibition on imports of Russian pipeline gas and liquefied natural gas, as part of its REPowerEU roadmap to end reliance on Moscow’s energy exports. A full ban on LNG imports will come into force from early 2027, and on pipeline gas by late 2027 at the latest. Before authorising entry into the EU, member states must now ‘verify the country where gas was produced.’ This requirement underpins the mechanism forcing exporters to prove non-Russian origin for supplies

The immediate trigger was political. In November, a French MEP, Jean-Paul Garron, accused the EU of quietly circumventing its own sanctions by importing Russian gas disguised as Azerbaijani. Brussels dismissed the charge at the time, stressing that the Southern Gas Corridor, the pipeline system bringing Caspian gas via Georgia, Trkiye and Greece, has no technical link to Russia’s network. That remains true. Yet since then, the Commission has moved to impose additional verification requirements, forcing both EU member states and foreign suppliers to prove that gas entering the bloc is not of Russian origin.

The Commission’s June 2025 proposal to phase out Russian gas and oil imports entirely by the end of 2027 follows a decade-long effort to reduce reliance on Moscow’s energy leverage. Before the full-scale invasion of Ukraine in 2022, Russia supplied as much as 40-45% of EU gas imports; by 2025, that share had fallen to around 13%, thanks to diversification efforts. The current push to ban Russian gas and require origin verification is a natural extension of that strategy.

The new checks apply most visibly at Strandja-1-Malkochlar, the interconnection point on the Bulgarian-Turkish border. According to ENTSOG, around 1.9 billion cubic metres of gas passed through this point into Bulgaria in 2025. The location is sensitive not because of Azerbaijani gas, but because of what sits nearby. Just a few kilometres away is Strandzha-2/Malkoclar, the onshore continuation of TurkStream, the pipeline carrying Russian gas across the Black Sea to Trkiye and onwards into south-eastern Europe.

Until now, geography and shared infrastructure have allowed uncomfortable ambiguities. Even after Bulgaria declared in 2022 that it would stop buying Russian gas, it emerged a year later that Gazprom molecules were still entering the country through the Trans-Balkan system. Brussels has learnt from that episode. Under the new regime, any compressor station that connects EU pipelines to routes carrying substantial Russian volumes will face similar scrutiny. The aim is simple: to ensure that Russian gas does not slip into the EU through legal grey zones.

This has consequences far beyond Bulgaria. Since 2023, Azerbaijan has been using the Trans-Balkan pipeline in reverse mode to supplement deliveries to Europe. The reason is capacity. The Trans-Adriatic Pipeline (TAP), the European leg of the Southern Gas Corridor, was expanded this year to around 11.2bn cubic metres annually. That is still less than Azerbaijan’s actual exports: in 2025, Baku shipped roughly 12.9bn cubic metres to European buyers. Unless further expansions are completed, part of that volume must continue to flow via the Trans-Balkan route, and therefore through infrastructure now subject to enhanced checks.

For Azerbaijan, this is an inconvenience rather than a threat. Its gas is produced under production-sharing agreements with international oil companies and marketed under strict transparency rules. Certifying origin is unlikely to pose a serious problem. Indeed, Brussels’s insistence on verification implicitly acknowledges Baku’s growing role as a strategic supplier whose volumes must be accommodated, even as Europe tightens sanctions.

The European Union checks the quality and origin of Azerbaijani gas in two main ways: through physical-chemical characteristics and origin documentation. Each shipment is accompanied by a certificate of origin, confirming that the gas comes from Azerbaijan and has not been mixed with supplies from other countries. Physical inspections are conducted at border stations, such as Strandja-1/Malkoçlar, where the gas is analysed for methane content, other components (ethane, propane, nitrogen, CO2), harmful substances (H2S, water vapour, dust), and calorific value/Wobbe index. Laboratory results are certified in protocols and submitted to EU regulators. Under new rules, the EU also verifies that the gas is not of Russian origin, using transit data, documentation, and real-time monitoring systems.

Since gas production in Azerbaijan is carried out with international company participation and high transparency standards, the origin of every cubic meter can be easily confirmed, ensuring no issues for deliveries to Europe. As a result, Azerbaijani gas fully meets EU standards for both quality and origin, while the EU’s verification mechanisms are designed to ensure safety, energy efficiency, and prevent Russian gas from entering the market.

The real casualty is Trkiye. Ankara has spent the past decade positioning itself as a regional gas hub, investing heavily in LNG terminals, expanding underground storage and leveraging its geography to sit astride Russian, Caspian and Middle Eastern flows. That strategy relied, at least in part, on Russian gas remaining commercially usable for Europe. The EU’s new controls draw a firm line through that assumption. Russian gas may enter Trkiye, but it will not enter the EU through Trkiye.

The numbers are stark. Last year, roughly 17bn cubic metres of Russian gas reached Hungary, Slovakia and Serbia via TurkStream. Since the start of this year, daily flows have been running close to capacity. Once the EU’s ban takes full effect, only Serbia, outside the EU, will remain a destination, taking around 2.2bn cubic metres annually. The Balkan transmission system, built for more than 15bn cubic metres, will be drastically underused. Transit revenues for Trkiye could fall by billions of dollars.

There is a partial consolation. With Europe closed off, Russia will struggle to redirect tens of billions of cubic metres elsewhere in the short term. Trkiye, which still imports about 21bn cubic metres of Russian gas a year out of total consumption of roughly 60bn, may be able to negotiate steeper discounts. Domestic production from the Sakarya field in the Black Sea, around 9m cubic metres a day, enough for some four million households, helps, but imports will remain essential.

Seen from Brussels, this is collateral damage worth accepting. The EU’s overriding objective is strategic clarity: no Russian gas, no ambiguity, no creative relabelling. By enforcing origin checks at critical nodes, the bloc is signalling that its energy divorce from Moscow is entering a more disciplined, rule-based phase.

Europe still needs Caspian gas, and in volumes that exceed existing pipeline capacity. Today, Azerbaijan supplies natural gas to 16 countries, 10 of which are EU member states, giving it the widest geographical coverage of pipeline gas exports globally. Verification may slow flows at the margins, but it also underlines Baku’s value as a supplier whose gas can be traced, audited and politically defended. In an energy market shaped as much by geopolitics as by geology, that distinction matters.

Georgia targets completion of key transit highway linking Trkiye, Azerbaijan, and Armenia

Georgian Prime Minister Irakli Kobakhidze has announced that construction on most of the main sections of the highway stretching from the Turkish border to the Armenian and Azerbaijani borders is expected to be completed by the end of the decade, Azernews reports.

Speaking to PosTV, Kobakhidze said the government aims to make maximum use of Georgia’s strategic geographical position by further developing its transport infrastructure, particularly its role as a regional transit hub. He noted that large-scale investments are being directed toward this goal.

According to the prime minister, the main sections of the road connecting the Turkish border with Azerbaijan and Armenia are planned to be put into operation by the end of 2030.

Sputnik Georgia reported that under the 2026 state budget, construction will be fully completed on several major sections of the highway network. These include the Rustavi-Kyrmyz Korpu and Algeti-Sadakhli sections, as well as the Batumi-Sarp road leading to the Turkish border.

The project is seen as a key component of Georgia’s broader strategy to strengthen regional connectivity and enhance its role in cross-border trade and transit between the South Caucasus and neighboring regions.

Russian tanker detained by US forces after sanctions chase across oceans [VIDEO]

US forces operating in the Indian Ocean have detained the oil tanker Aquila II for violating a sanctions regime imposed by the administration of US President Donald Trump, Azernews reports.

According to the US Department of War, cited by European Pravda, the US Armed Forces overnight carried out an inspection, maritime blockade and boarding of the vessel, with the operation proceeding without incident.

In a statement published on X (formerly Twitter), the Department of War said the tanker had been operating in defiance of US restrictions.

‘The Aquila II was operating in defiance of President Trump’s established quarantine of sanctioned vessels in the Caribbean. It ran, and we followed. The Department of War tracked and hunted this vessel from the Caribbean to the Indian Ocean. No other nation on planet Earth has the capability to enforce its will through any domain. By land, air, or sea, our Armed Forces will find you and deliver justice. You will run out of fuel long before you will outrun us,’ the statement said.

Ukraine’s defence intelligence agency reported that the tanker is involved in the export of sanctioned Russian oil and petroleum products from Russian ports in the Black Sea, the Baltic Sea and the Pacific region. According to the agency, these operations were carried out using deceptive practices to conceal the vessel’s activities.

The Aquila II is considered part of Russia’s so-called shadow fleet and is linked to Sunne Co Ltd, a company sanctioned by the United States in January for its involvement in Russia’s energy sector.

Filmmakers’ Union launches feature film lab

The Azerbaijan Filmmakers’ Union, in partnership with the Institut Français Azerbaïdjan and the French Embassy in Baku, has announced the international “East-West Kino Lab” program for the development of feature film projects, AzerNEWS reports.

The program aims to help both emerging and experienced Azerbaijani filmmakers develop their feature film projects to international standards, providing professional mentorship and training to prepare them for global platforms. Selected participants will have the opportunity to structure and strengthen their projects, bringing them to a presentation-ready stage. Through masterclasses and one-on-one mentoring sessions, projects will receive professional guidance throughout development and presentation phases, while participants will also gain valuable networking opportunities with international film professionals.

Applications are open to Azerbaijani producers and directors working in teams on feature film projects at the development stage. The screenwriter of the selected project may participate as a listener. Directors must hold the copyright for their projects, with the screenwriter’s consent. Since the program will be conducted in English, the presenting team (director and producer) must be proficient in English (at least one member), and all submitted materials must be in English.

The one-week development program is designed for filmmakers with feature-length projects who already have a logline, synopsis, and treatment. During the training, participants will receive intensive lessons and one-on-one guidance to refine their loglines, synopses, and treatments, while also developing skills for pitching and presenting their projects.

Interested participants should submit all information in English as a single PDF file (named after the applicant) to info@aki.az with the subject line “East-West Kino Lab.”

The application deadline is March 5, and the training will take place from April 8-14. Projects that succeed in the pitching stage will receive technical, financial, and organizational support to further their development.

Founded in 2012, the Azerbaijan Filmmakers Union (AUF) focuses on the development of local cinema as an integral part of national culture and world cinema.

Azerbaijani cinema has come to be an internationally recognized modern art, enjoying huge popularity and recognition at international film festivals, which frequently award the national films.

Over the past years, more than 300 films and 1,200 documentaries, as well as hundreds of cartoons, were filmed.

The Azerbaijan Filmmakers Union is a member of the Confederation of Unions of Cinematographers of the CIS and Baltic States.

Who is Rashad Ismayilov, Azerbaijan’s new ecology minister?

Rashad Sahil oglu Ismayilov has been appointed Minister of Ecology and Natural Resources of Azerbaijan, President Ilham Aliyev announced in a signed decree, AzerNews reports.

The ministry has been vacant since February 5, 2025, following the dismissal of the President’s representative on climate issues, Mukhtar Babayev.

Who is Rashad Ismayilov?

Born on August 27, 1979, Ismayilov holds bachelor’s and master’s degrees in law from Baku State University. He began his career in 2000 as a lawyer at the small enterprise Zahmet. Over the following years, he held legal and advisory roles in both the private sector and government bodies, including:

Lawyer at ‘Star LTD’ LLC (2005-2006)

Lawyer-specialist at the Ganja city Auditor Organization of the Chamber of Auditors of Azerbaijan (2006)

Senior legal advisor at the State Registry Service of the Republic of Azerbaijan (2006-2009)

Lawyer and senior advisor at the Icherisheher State Historical and Architectural Reserve Department under the Cabinet of Ministers (2010-2013)

Head of the Legal Expertise Sector and Deputy Head of the Legal and Control Department at the Housing Construction Agency under the President (2013-2018)

Head of the Legal and Internal Control Department and later Head of the Office of the State Urban Planning and Architecture Committee (2018-2024)

On August 15, 2024, by presidential order, Ismayilov was appointed First Deputy Minister of Ecology and Natural Resources, a position he held until his recent elevation to minister.

South Caucasus and Central Asia hold strategic importance for U.S. companies

The South Caucasus and Central Asia are emerging as strategically important regions for American businesses, AzerNEWS reports, citing a senior official of the U.S. Chamber of Commerce.

Speaking at a briefing held in Baku, Khush Choksi, Senior Vice President of International Member Relations, Middle East and Trkiye at the U.S. Chamber of Commerce, emphasized that the organization-the world’s largest business association-operates globally and sees growing opportunities in these regions.

‘The South Caucasus and Central Asia are developing markets of significant interest to U.S. companies,’ Choksi said. He noted that the Chamber’s active engagement with Azerbaijan began two years ago, when it brought a delegation to the country during the COP conference. ‘Azerbaijan hosted the event at a very high level, placing equal emphasis on both traditional and renewable energy sources. This ideal balance attracted businesses and marked the Chamber’s first serious step into Azerbaijan,’ he added.

According to Choksi, the delegation included more than 31 companies and over 60 participants, with both days of the briefing proving highly productive.

Highlighting Azerbaijan’s economic profile, Choksi stressed that diversification is one of its most remarkable features. ‘Even energy today accounts for only 3.7 percent of the economy, which demonstrates the broad balance of the country’s economic structure,’ he said. ‘This is also reflected in the wide range of sectors represented in our delegation and in the overall interest in Azerbaijan.’

He explained that the delegation comprised companies from telecommunications, energy, defense, healthcare, payment systems, and banking, while manufacturing was also represented in various forms. ‘The scope is extremely broad. In other words, Azerbaijan’s economy is developing comprehensively,’ Choksi noted.

As economic growth continues, new opportunities are also emerging in the banking and financial sectors, he said. Azerbaijan’s role in multiple transport corridors offers significant potential, particularly in digital payments and related growth areas.

Choksi also pointed to the country’s expanding tourism sector, describing it as a wide-ranging field that includes aircraft manufacturing such as Boeing, as well as international hotel brands like Hilton and Marriott. ‘The diversity of opportunities in tourism alone is quite substantial,’ he said.

Addressing the energy sector, Choksi underlined Azerbaijan’s potential role as a regional hub. He noted that the country’s strong infrastructure enables it to leverage energy resources to further diversify its economy and sustain long-term growth.

‘Azerbaijan’s development presents multiple opportunities,’ he said, citing tourism as an example, including rising visitor numbers, ski resorts, modern infrastructure, and Baku’s rich historical heritage.

Choksi also highlighted Azerbaijan’s strategic geographical position. ‘Its location connecting East and West supports Europe’s energy needs, transport routes, logistics, manufacturing, and North-South connectivity,’ he said. ‘Azerbaijan can serve as an energy hub, especially as the region continues to develop. The country is strategically positioned to provide access to a number of markets beyond its borders.’

Baku Military Court hears case against Ruben Vardanyan

The trial of Ruben Vardanyan, an Armenian citizen accused under Azerbaijan’s Criminal Code of crimes against peace and humanity, war crimes, terrorism, financing terrorism, and other serious offences, continued on February 10.

AzerNEWS reports that the session was held at the Baku Military Court, where Rufat Mammadov, head of the Cabinet of Ministers’ Apparatus, appeared on behalf of the Azerbaijani state as a civil plaintiff. He confirmed that he agreed with all the facts, evidence, and proofs presented in the indictment by the state prosecution and requested the court to take them into consideration.

Following this, legal heirs of the victims, including Azad Karimov, Ogtay Shikhaliyev, and others, addressed the court, urging that the accused be sentenced to the maximum punishment of life imprisonment.

The accused, R. Vardanyan, requested to speak with his defence attorney, Emil Babishov. The court approved his request, and a recess was declared to allow the meeting.

Russia looking to evacuate specialists from Iran’s Bushehr nuclear plant, new footage suggests [VIDEO]

Russia is preparing contingency plans to evacuate specialists working at Iran’s Bushehr Nuclear Power Plant, amid heightened regional tensions and growing concerns over security risks surrounding nuclear facilities, AzerNEWS reports.

According to Russian officials, Moscow is coordinating with its Foreign Ministry and Defense Ministry to ensure the safety of personnel deployed at the site, as was stated last week. Russia’s state nuclear corporation Rosatom has confirmed that evacuation scenarios are being considered, though no final decision has been taken so far.

Meanwhile, video footage shows heightened activity linked to personnel movements, adding visual confirmation to reports that precautionary measures are underway. While the footage does not indicate an immediate evacuation, it aligns with official statements that Russia is closely monitoring the situation and remains prepared to act if conditions worsen.

Bushehr is Iran’s only operational nuclear power plant and employs hundreds of Russian specialists involved in technical operations, maintenance, and construction-related work. Russian officials have repeatedly warned that any military action targeting the facility could lead to catastrophic consequences, given the presence of nuclear material and foreign personnel.

Defense concludes in Ruben Vardanyan trial, final verdict pending

The defense has concluded its statements in the ongoing trial of Armenian citizen Ruben Vardanyan, who faces multiple charges under the Criminal Code of Azerbaijan, including crimes against peace and humanity, war crimes, terrorism, and financing terrorism.

Azernews reports that on February 10, after Vardanyan and his defense team made their final statements, presiding judge Zeynal Aghayev asked both the prosecution and defense whether they would submit a draft of the final court decision. Both parties declined. The judge subsequently announced the end of the court hearing.

The final verdict will be delivered after the court returns from deliberations.

Vardanyan is accused of a wide range of offenses, including planning and waging a war of aggression, deportation and forced transfer of the population, persecution, enforced disappearance, torture, violations of the laws and customs of war, intentional and attempted murder, terrorism, financing terrorism, creation of criminal associations, and illegal crossing of the state border.

The charges cover violations of both national criminal law and international humanitarian law during armed conflict.