Everllence has been commissioned to supply the CO2 compression systems for Net Zero Teesside Power (NZT Power) and the Northern Endurance Partnership (NEP) – two flagship projects within the UK’s government-backed East Coast Cluster decarbonization initiative in northeast England. NZT Power is poised to be the UK’s first commercialscale gas-fired power plant with integrated carbon capture and storage (CCS). NEP will provide the transportation and storage backbone of the East Coast Cluster, gathering CO2 from NZT Power and other industrial sources and permanently storing it in offshore geological formations beneath the North Sea – helping to decarbonize local power generation and industry on Teesside. Developed as a joint venture between bp and Equinor, NZT Power will generate more than 740 megawatts of dispatchable low-carbon electricity, equivalent to the average annual consumption of more than one million UK homes, while capturing up to 2 million tonnes of CO2 per year.