To understand why the Civil Aviation Authority of Botswana (CAAB) failed to prevent charter plane crashes out of Maun International Airport, just follow the money.
An independent probe by R4 Forensics has backed up last week’s Sunday Standard exposé on CAAB’s safety crisis, revealing that the dangers to Botswana’s skies did not begin on the runway, but in the regulator’s compromised ledger books.
Compiled for the CAAB Board, the privileged accountability report forms the basis for the precautionary suspension of top finance and procurement executives.
The R4 Forensics report draws a direct line between broken internal policing in CAAB’s ledger books and operational hazards on the ground in Maun and other parts of the country. It reveals that while safety red flags mounted at Botswana’s busiest tourism gateway, senior officials in Gaborone were presiding over cancelled security upgrades, raided air-traffic budgets, lost spare-parts files, and uncontracted emergency fuel purchases.
While CAAB management has repeatedly assured the travelling public and international tourism operators that aviation safety remains paramount, the R4 Forensics report documents how elementary security and safety controls broke down at Maun International Airport, Sir Seretse Khama International Airport and other airports throughout the country.
In one major lapse, CAAB launched a tender for integrated security systems covering Sir Seretse Khama International Airport (SSKIA), Phillip Gaonwe Matante International Airport (PGMIA), and Maun International Airport against an allocated budget of P32.54 million. An integrated airport security system is a central digital command network that links perimeter fence sensors, surveillance cameras, baggage scanners, and staff access gates into a single control room to spot and stop threats in real time.
When the sole quotation from Aviation Projects and Management Services arrived at P101.41 million, more than triple the budgeted amount, the project stalled. On 26 May 2026, Procurement confirmed the security upgrade had been cancelled altogether due to insufficient funds.
The forensic investigation also uncovered severe budgeting and record-keeping failures across national air-navigation systems, the very infrastructure responsible for guiding charter flights safely through Botswana’s airspace.
A tender for an Air Traffic Surveillance System (CAAB 40/23-24/GEN) was negotiated at BWP160.41 million against an approved budget of BWP130 million, an unbudgeted overrun of BWP30.41 million (23.4%). To cover the shortfall, CAAB transferred BWP28.74 million out of its IP-Based Communications project (the modern digital network carrying voice and flight data between air traffic control centres), leaving P1.67 million with no identified funding source.
A tender for Garex Voice 220 spare parts (DANS 15/24-25/SUPL), the core radio and telephone switching system air traffic controllers use to speak directly to pilots in flight, drew an evaluated quote of roughly P5.5 million (USD396,198) against a BWP3 million budget. Procurement subsequently informed investigators it could not locate the file documenting the tender’s cancellation, leaving the fate of a P5.5 million safety procurement unverified.
A selective tender involving bids of ZAR14.77 million (ADB Safegate) and ZAR15.52 million (Orthofusion Investments) exceeded available funds and had to be halted until the budget was revised to P16.19 million.
Why did the price tags explode? In public procurement, a threefold jump between a BWP32.5 million budget and a BWP101.4 million quote points to a double failure of flawed pre-tender budgeting and a lack of competitive bidding. Before advertising specialized aviation tenders, officials are required to check current global prices and exchange rates to ensure budgets are realistic. Instead, CAAB repeatedly went to market with severely underestimated budgets, and when only a single supplier bid on the airport security project, there were no rival companies to force the price down. Worse still, Procurement failed its basic gatekeeping duty to halt the tenders or alert management once those massive funding gaps became clear.
Compounding these risks, R4 Forensics investigators found that while Head Office and SSKIA used the automated ACCPAC procurement system, outstations such as Maun relied substantially on scattered manual paper records, leaving management without consolidated oversight of pending maintenance or compliance exceptions. Even basic Personal Protective Equipment (PPE) clothing supplied by NDT Botswana showed unexplained discrepancies between delivery quantities, unit costs, and invoices, leading to a proposed charge (PROC-07) against a receiving officer.
The R4 Forensics forensic report makes clear that the breakdown in procurement mirrors wider governance failures across the Finance and Procurement Directorate.
As far back as 2019, audit firm KPMG warned CAAB of an ‘immature’ control environment marked by delayed reconciliations, unchecked system-access rights, and poor segregation of duties. Yet comprehensive Finance and Accounting Procedures remained in draft form as of March 2026.
External audits for 2024 and 2025 repeatedly flagged unresolved weaknesses in project-fund reconciliations, unauthorized project transfers, and asset verification. Inside that control vacuum, investigators uncovered confirmed minimum misappropriations of P570,327.39 between November 2024 and July 2025, including P479,614.90 diverted through five unauthorized payments to Overcroft Holdings (Pty) Ltd and P90,712.49 in unauthorized overtime, after system-generated payroll summaries were replaced with manually filtered Excel spreadsheets. Investigators also identified 491 groups of potential duplicate overtime entries, despite an internal audit warning sent in June 2020.
In one stark example of absent system guardrails, a clerk accidentally entered a unit price of P119,960.73 into the quantity field of purchase order PO-000005639, posting an erroneous P14.36 billion transaction into CAAB’s accounting system without triggering an automated block, secondary sign-off, or exception report. (STORY CONTINUES NEXT WEEK)